Console Table Tender Packages for Architects: Writing a Clear Furniture Specification Clause

A vague console table line in a tender leads to mismatched quotes and disputes later. This guide shows architects how to structure a furniture specification clause, with sample wording you can adapt.

A well-written furniture specification clause tells every bidder exactly what to price, so the quotes you receive can be compared fairly. For a console table, a single line such as "oak console, 120 cm, matt finish" leaves too many gaps. This guide shows you how to structure the clause and gives sample wording you can adapt for your own tender documents.

The advice applies to hotels, restaurants and residential schemes alike. We make custom hospitality furniture to order and ship worldwide, so the points below reflect what factories need in order to quote accurately.

Why the clause matters in a tender

In an architect FF&E specification, the furniture clause is the only text that bidders, the procurement team and the site inspector all read. If it is ambiguous, each supplier fills the gaps differently, and the cheapest quote is often the one that assumed the simplest build.

A clear clause protects you in three ways:

  • Bids are comparable because every supplier prices the same material, construction and finish.
  • Approvals are easier because acceptance criteria are written down before production starts.
  • Variations are controlled because any change from the clause is visible and has to be agreed.

The building blocks of a console table specification text

Think of the clause as a set of short, numbered statements. Each one answers a question a bidder would otherwise have to ask or guess.

1. Reference and quantity

Give the item a code that matches your drawings and room or area schedule, and state quantities per location. If the same design appears in several sizes, list each size as its own line.

2. Dimensions and tolerances

State overall length, depth and height in millimetres, with imperial in brackets if the project needs it. Add the tolerance you will accept, and say whether dimensions refer to the finished piece or to a niche it must fit.

3. Materials

Name the species or board type, the form (solid, veneer on engineered core) and any grade requirements. If a stone or glass top is part of the item, specify thickness, edge and supplier-neutral colour reference.

4. Construction and hardware

Describe joinery expectations, fixing method to the wall if relevant, and any drawers, doors or cable cut-outs. Name hardware by performance, for example soft-close runners suitable for commercial use, rather than by brand alone.

5. Finish

Identify the finish type, sheen level and colour reference. A physical sample or a RAL, NCS or Pantone code is more reliable than a colour name.

6. Fire, environmental and compliance requirements

Refer to the regulations that apply in the project country. Do not assume the bidder knows them; state what documents you expect, such as test reports for finishes or declarations for timber origin.

7. Samples, mock-up and approval

Say how many samples are required, who approves them and what happens between approval and production release.

8. Packing, delivery and installation

State the Incoterm you want priced (EXW, FOB, CIF or DAP), the delivery address and whether installation is included or separate.

Sample wording you can adapt

The text below is a template. Replace the items in square brackets with your project data and delete anything that does not apply.

Item CT-01 – Entrance Console Table

Supply [quantity] units of console table as shown on drawing [drawing number, revision]. Overall dimensions: length [1200] mm, depth [350] mm, height [850] mm, tolerance +/- [2] mm. The table shall be installed against a flat wall with skirting height of [100] mm; the design shall allow for skirting clearance.

Materials. Top and frame in [solid oak / oak veneer on engineered core, A-grade face]. Timber shall be kiln-dried to a moisture content suitable for the destination climate. Veneer shall be sequence-matched across all units of the same type.

Construction. Joints shall be [mortise and tenon / dowelled] with hidden fixings. Legs shall have adjustable levelling feet. Where wall-fixed, the supplier shall provide fixing details suitable for [masonry / drywall] and shall state the tested or calculated load capacity of the top.

Finish. [Water-based lacquer], [satin] sheen, colour matched to approved sample [reference]. The finish shall resist normal hotel cleaning products, and the supplier shall state recommended care instructions.

Samples and approval. The supplier shall submit one finish sample and one full-size prototype for approval. Production shall not start until written approval is issued by the Architect. Approved items shall be retained as the reference for batch inspection.

Packing and delivery. Each unit shall be individually protected and labelled with item code and area. Prices shall be submitted on [FOB / CIF / DAP] terms to [destination]. Installation is [included / excluded].

Performance wording versus prescriptive wording

You can write a clause in two ways. Prescriptive wording fixes the material, size and method. Performance wording defines the result, such as load capacity, finish resistance or fire classification, and lets the bidder propose how to achieve it.

For signature pieces with a defined look, prescriptive wording is safer. For secondary items, a short performance statement can widen the field of bidders without lowering quality. Many architects combine both: fix the visible features and describe the hidden ones by performance.

Attachments that make the clause work

The text should not carry everything. Support it with documents that bidders can price from:

  • Elevations, plan and section with key dimensions.
  • Joinery details at the leg-to-top connection and wall fixing.
  • A finish reference, preferably a physical sample or colour code.
  • The area schedule showing where each item goes.
  • A pricing sheet that asks for unit price, packing and shipping as separate lines.

Common wording mistakes

  • "Or equal" without criteria. If you allow alternatives, say what must be equal: material, size, finish performance.
  • Colour by name only. Words like "honey" or "espresso" mean different things to different factories.
  • No tolerance. Without one, a few millimetres of variation can become a dispute.
  • Silent on the Incoterm. Bids priced on different terms cannot be compared.
  • Missing quantity per size. Bidders may quote an average that does not match the real order.

Checking the clause before issue

Before the tender goes out, ask someone outside the design team to read the clause and list any question they would put to the architect. Each question points to a gap. A short conversation with a manufacturer at this stage can also reveal details that affect cost or lead time, such as wall fixing or finish limits, without committing you to a supplier.

Next step

If you are preparing a tender package that includes console tables, send us your drawings or draft clause. We will review it from a production point of view and tell you what is clear, what may be priced differently by bidders and what details to add, along with an estimate based on your project requirements.

Sıkça Sorulan Sorular

What should a furniture specification clause include?

It should include the item code, quantity, dimensions with tolerances, materials, construction details, finish reference, compliance requirements, sample and approval steps, and packing and delivery terms. Supporting drawings and a pricing sheet help bidders quote the same scope.

Should I name a brand or write a performance specification?

Use a brand or exact reference for items where the look is fixed, such as a signature finish. For hidden components like hardware, performance wording works well. Many tenders combine both, adding clear criteria if alternatives are allowed.

How do I specify finish colour in a tender?

Use a physical sample or a code such as RAL, NCS or Pantone rather than a colour name. State the sheen level too. Colour can look different under daylight and hotel lighting, so approve the sample in the real setting where possible.

Can a factory outside my country bid on my tender?

Yes, if the tender allows it. Specify the Incoterm, destination, required test documents and installation scope clearly. We produce to order and ship worldwide, and clear documents let overseas bidders price accurately.

Do I need a prototype before approving production?

For custom pieces or large quantities, a prototype is strongly advisable. It lets you check proportions, finish and fixing details. Write into the clause that production starts only after written approval, and keep the approved piece as a reference.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Related products

All Console Table Models

Get a quote for Console Table Models

Share dimensions and quantities; we will prepare a quote for your project.