Console Table Handover Documents: Care Manuals, Finish Codes and Attic Stock Lists for Hotel Owners

A console table is only fully delivered when the paperwork that keeps it looking right for years arrives with it. This guide defines the closing document pack hotel owners should ask for: care manuals, finish codes and attic stock lists.

Good furniture handover documents are what allow a hotel team to clean, repair and reorder console tables long after the project team has left. Without them, a simple question such as "which finish is this?" can turn into weeks of guesswork. This guide sets out the document pack we recommend owners and operators request at closing, and what each part should contain.

The focus here is on wooden console tables, but the same logic applies to any case goods or fixed joinery in your FF&E package.

Why the handover pack matters for console tables

Console tables sit in the most visible places in a hotel: entrances, corridors, lobbies and suites. They are touched, bumped by luggage and wiped by housekeeping every day. Over a few years, small marks and finish wear are normal, and the operator needs to know how to respond.

Staff also change. The designer, procurement manager and project manager who approved the pieces may no longer be involved when a replacement is needed. A complete pack keeps that knowledge inside the hotel rather than in someone's inbox.

  • It reduces avoidable damage from wrong cleaning products.
  • It speeds up repairs and touch-ups because the finish is documented.
  • It makes reorders accurate, so new pieces match the existing ones.
  • It supports asset registers and insurance records.

The core documents in a handover pack

Packs vary by project size, but a practical set for console tables includes the following items. Agree the list with your manufacturer before production, not after delivery.

DocumentPurposeWho uses it
Product data sheetRecords materials, dimensions, construction and hardwareEngineering, procurement
Care manualExplains daily cleaning and what to avoidHousekeeping
Finish code recordIdentifies the exact finish and sample referenceProcurement, maintenance
Attic stock listLists spare parts and pieces held in storageOwner, asset manager
As-built drawingsShows final dimensions, fixings and any approved changesContractors, reorder team
Room or location scheduleMaps each piece to its place in the buildingOperations

Writing a useful care manual for hotel furniture

A care manual for hotel furniture should be written for the people who use it: housekeepers and maintenance technicians, many of whom may not read English as a first language. Short, clear instructions with simple pictures work better than long technical text.

What to include

  • Daily cleaning: a soft, slightly damp cloth followed by a dry cloth is the usual starting point for most coated wood surfaces. The manual should confirm this for your specific finish.
  • Products to avoid: abrasive pads, strong solvents and some multi-surface sprays can dull or soften certain finishes. Name the product types to avoid rather than only brands.
  • Liquids and heat: advise using trays or coasters and keeping hot items off the top unless the surface was specified for it.
  • Moving and cleaning around the piece: notes on lifting rather than dragging, and on protecting corners from trolleys.
  • Periodic care: for oiled finishes, state whether and how re-oiling is done and how often it is typically reviewed. For lacquered finishes, explain that the coating is not re-oiled.
  • Who to call: a clear route for repairs that go beyond housekeeping, such as deep scratches, loose legs or lifting veneer.

Ask your manufacturer to base the manual on the actual finish system used, because care advice for an oil finish differs from that for a polyurethane or water-based lacquer. Generic advice copied from another project can cause damage.

Finish codes: the record that makes matching possible

A finish code record is probably the most valuable page in the pack for future reorders. Wood colour is hard to describe in words, and names like "natural" or "dark walnut" mean different things to different people.

What a finish code record should capture

  • Timber or veneer species and cut (for example, oak, flat-cut or quarter-cut).
  • Stain or colour reference, including any internal factory code and, where used, a RAL or Pantone reference for painted parts.
  • Finish type and gloss level, such as matte, satin or high gloss.
  • Number of coats or the finishing system, in general terms.
  • The approved sample: its identification number, date of approval and who signed it off.
  • Photographs of the approved sample and of a finished piece under neutral light.

Keep one approved sample physically in the hotel, labelled and stored away from direct sunlight. A photograph is helpful, but screens and lighting change how wood colour appears, so a physical reference is much more reliable. Natural timber also varies from batch to batch, so a code gets the factory close, and the sample lets both sides judge the result.

The attic stock list: planning for the unexpected

Attic stock, sometimes called spare stock or maintenance stock, is the extra material set aside at the time of the order. For console tables this may include spare complete pieces, replacement tops, legs, drawer fronts, hardware and touch-up finishing material.

The attic stock list should record what exists, where it is stored and what condition it is in. It should also state the quantities agreed in the contract, so the owner can check that the delivery matches.

Suggested contents of the list

  • Item description and reference code that matches the product data sheet.
  • Quantity delivered and storage location.
  • Packing method used for storage, so pieces are protected over time.
  • Date delivered and date last inspected.
  • Notes on which room types or areas each spare is intended for.

How much to hold depends on the number of consoles, how heavily they are used and how easy a reorder will be. We do not suggest a fixed percentage, because the right level depends on your property and your risk tolerance. Discuss it with your manufacturer during quotation so the cost and storage space are planned from the start.

As-built drawings and fixing details

Drawings produced for approval sometimes change during production. Ask for as-built drawings that show the final dimensions, joinery details, wall fixing points and any approved modifications. These are essential when a contractor needs to replace a wall-mounted piece or when a factory needs to reproduce an item exactly.

Include the hardware list too: hinge, runner and fixing types, with supplier references where available. This saves time when a single component needs replacing.

When to agree the document pack

The best moment to define the pack is at order confirmation, alongside the specification and sample approval. Treating documents as a deliverable with a due date prevents them from being forgotten at the end of a busy opening schedule.

  1. At quotation: state which documents you expect and in what language and format.
  2. At sample approval: record the finish code and keep the signed sample.
  3. During production: update drawings and photographs as changes are approved.
  4. Before shipment: review the draft pack and attic stock list against the packing list.
  5. At handover: deliver the pack digitally and as a printed copy for the engineering office.

Formats and storage that work internationally

For projects delivered across different countries, keep the pack simple and portable. PDF files with clear file names, supported by a single index sheet, are easier to search than scattered emails. Include metric dimensions first and imperial values in brackets if your team uses both.

Store the digital pack in a shared location that survives staff changes, and attach the finish code and product data sheet to your asset register entry. If your property group uses a maintenance software system, ask the manufacturer to provide item codes in a format you can import.

Closing thoughts

Complete furniture handover documents turn a one-time delivery into a pack that supports maintenance and future reorders. For console tables, the three most useful pieces are the care manual, the finish code record and the attic stock list, supported by as-built drawings and a product data sheet.

If you are planning a hotel project and want the document pack defined from the start, send us your drawings or specification. We will review the console tables and propose the handover documents, sample records and spare stock that suit your property, wherever it is located.

Sıkça Sorulan Sorular

What documents should a hotel receive with custom console tables?

A typical pack includes a product data sheet, a care manual, a finish code record with the approved sample reference, an attic stock list, as-built drawings and a location schedule. The exact set should be agreed with the manufacturer at order confirmation, together with the language and file format.

What is a finish code record and why does it matter?

It is a written record of the species, stain or colour reference, finish type, gloss level and approved sample for each piece. It lets you reorder or touch up consoles years later and get a close match, especially when it is supported by a labelled physical sample and photographs.

What is an attic stock list in hotel furniture?

It is an inventory of spare furniture, parts and finishing materials set aside at the time of the order. It records quantities, storage locations and condition, so the owner can repair or replace console tables quickly without starting a new production order.

How much attic stock should I order for console tables?

There is no single correct figure. It depends on the number of pieces, how heavily they are used, the finish and how easily you can reorder. Discuss spare tops, legs, hardware and complete pieces with your manufacturer during quotation so cost and storage are planned early.

Should the care manual be written for each project?

Yes, it should reflect the actual finish system and materials used. Cleaning advice for an oiled surface differs from advice for a lacquered one, and generic instructions can damage a finish. Short, illustrated instructions are also easier for housekeeping teams to follow.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Related products

All Console Table Models

Get a quote for Console Table Models

Share dimensions and quantities; we will prepare a quote for your project.